中文
TOWIN WeChat QR code
News

Sound Requirements for Outdoor Stage Construction by Shenzhen Stage Builders

Published: 2022-12-13

When Shenzhen stage builders construct outdoor stages for event organizers, they have specific requirements for the sound system. The details are as follows:

深圳舞台搭建公司搭建室外舞台之时对于音响有何要求?

Sound Engineer

Shenzhen stage builders require the sound engineer to maintain constant communication with an assistant seated in the audience area, so as to monitor the auditory experience from the audience's perspective and make necessary adjustments in real time.

Sound System

Outdoor open-air stages demand a sound system with high power output. When constructing stages for large outdoor events, Shenzhen stage builders deploy powerful sound systems to meet the extremely high acoustic requirements of open spaces, ensuring a superior listening experience for the audience.

Speakers

To guarantee optimal sound quality on stage, Shenzhen stage builders configure speakers and assign dedicated personnel to protect the cables, preventing any line faults that could affect sound diffusion. Additionally, speakers are installed at elevated positions to facilitate better sound propagation and coverage.

Site Guide:
Event Planning Conference Services Exhibition Services Product Launches Corporate Events Event Cases TOWIN Insights Contact Us